Criminal Research Center

Tripoli, Libya Mart 2025 — Temmuz 2025 (~5 Ay) Complete façade design and site implementation (March 2025 — July 2025, ~5 months)

Bulletproof glazing and revolving door façade execution at Tripoli Criminal Research Center
LOCATION Tripoli, Libya
PERIOD Mart 2025 — Temmuz 2025 (~5 Ay)
TYPOLOGY Institutional / High-Security
KCD SCOPE Complete façade design and site implementation (March 2025 — July 2025, ~5 months)

KCD Monaya delivered the complete façade engineering and on-site implementation for the Criminal Research Center in Tripoli, Libya. The project started in March 2025 and was completed in July 2025, representing an approximately 5-month execution timeline.

The envelope incorporates an architectural spider façade system (spider glass façade), a primary entrance revolving door system, bulletproof and double-glazed structural glass systems, transparent curtain walls, and thermally broken aluminium joinery.

Interior circulation galleries and exterior perimeters were equipped with safety-certified aluminium railings and glass balustrades adhering to institutional security specifications.

Project Scope

  • Complete façade design and site implementation (March 2025 — July 2025, ~5 months)
  • Revolving Door System
  • Spider Façade System / Spider Glass Façade
  • Structural glass façade systems with bulletproof and double-glazed insulation
  • Transparent curtain wall systems
  • Thermally insulated aluminium joinery and sliding systems
  • Insulated double-glazing architectural applications
  • Aluminium railing systems and aluminium-framed glass balustrades